City of SJ Construction Crane Notification Form Crane Notification Form Requirement: City notification of crane operation is required a minimum of 10-days prior to selected crane operation and each time the crane operation changes (crane erection, change in height, lowered for removal). The Notification form must be filled out for EACH crane. This form is separate from communications required in the FAA 7460 Determination of No Hazard.
Fill out my online form.